Lesson 11: Work, kinetic energy and potential energy

Work done against friction and the final speed

SkillWork and energy

Worked example

  • Complex familiar
  • Technology active

A 40 kg crate starts from rest and is pulled 12 m across a level floor by a horizontal force of 250 N. The friction force is 130 N. Determine

(a) the work done by the pulling force

(b) the work done by friction

(c) the final speed of the crate.

1 of 4 steps
  1. Step 1: (a) Work by the pulling force

    The force acts along the displacement: W=Fs=250×12=3000 JW = Fs = 250 \times 12 = 3000\unit{J}.

Try a similar one

A fresh question of the same kind, checked as you answer, with hints and a full solution.

Method

  1. W = Fs for each force, negative when the force opposes the displacement.

  2. Net work = change in kinetic energy.

  3. Solve the kinetic energy equation for v.

Watch out for

  • Using only the pulling force, which gives 12 m/s.

  • Forgetting the square root in the last step.

Save your progress with a free account