General Maths · Topic quiz

Networks and decision mathematics 1 quiz

10 questions across the topic, from foundation to complex unfamiliar, the way the exam mixes them. You see how you went at the end, with a worked solution for every question.

10questions
41minutes
4question types

Difficulty

  • 41 min on the clock: the working time each question needs. The quiz ends when time is up.
  • No calculator needed: this topic’s questions are technology-free.
  • Multiple choice, short response, graph interpretation and worked response. Answer in any order and change answers until you finish.

What it covers

  • Trees and spanning trees
  • Finding minimum spanning trees
  • Minimum connector problems
  • Project networks
  • Earliest starting times
  • Latest starting times
  • Critical paths
  • Float times
  • Scheduling problems

Each quiz is drawn fresh, so taking it again gives new questions. Your results update your mastery for this topic.

Revise first

The quiz draws on all 8 lessons in Networks and decision mathematics 1, and the 12 worked examples show the same kinds of questions solved step by step.

  1. Trees and spanning treesRecognise trees and spanning trees, explain why a tree with vv vertices has v−1v - 1 edges, and find the spanning trees of a small graph.
  2. Finding minimum spanning treesFind a minimum spanning tree and its weight by inspection, with Kruskal's method and with Prim's method, and recognise when there is more than one.
  3. Minimum connector problemsModel practical cable, pipe and path problems as minimum spanning trees, cost them, and adapt the method when a link must be used or cannot be used.
  4. Precedence tables and project networksRead a precedence table, and draw a project as an activity-on-arc network with each activity as a labelled arrow and each event as a numbered circle.
  5. Forward scanning and earliest starting timesScan a project network from start to finish to find the earliest starting time of every activity and the minimum time in which the project can be completed.
  6. Backward scanning, latest starting times and floatScan a project network from the finish back to the start to find the latest starting time of every activity, then calculate each activity's float.
  7. Critical paths and the minimum completion timeUse ESTs and LSTs to locate the critical path or paths of a project, and explain why their length is the minimum completion time.
  8. Solving scheduling problemsUse critical path analysis to decide what a delay does to a project, how far a project can be shortened, and how to justify scheduling decisions in context.